Critical Project at Ft. Belvoir Successfully Completed During Holidays

Kaleo Construction performed the demolition and renovation of the Endoscopy Department Scope Wash Room and Scope Storage Room at the Ft. Belvoir Community Hospital. The project required extensive coordination over the holiday to relocate scope disinfection sinks, an eye wash station, above sink wall mounted storage cabinets, wall mounted scope storage cabinets, along with the associated utilities including hot and cold water, sanitary sewer, electric circuits, telephone and data circuits. It also included the removal of suspended ceiling lighting fixtures and the renovation of the suspended ceiling grid in two rooms. With a mission critical completion date requiring very aggressive time constraints, this specialty project was completed on time and within budget, leading to additional renovation and specialty projects at the hospital.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>